×
Got Free Inquiry Now

We will contact you as soon as possible!

Cleanroom Window

Industry news

Home /

News

/

Industry news

  • What are the main points of clean room renovation?

    What are the main points of clean room renovation?

    24 Aug, 2020

    In the current economic situation, with the significant increase in the research and analysis of nanotechnology in all walks of life, the demand for small-scale clean laboratories is showing a significant growth momentum. Whether it is composite materials for automobiles and packaging materials...

    Read More
  • What are the characteristics of FFU?

    What are the characteristics of FFU?

    19 Jul, 2020

    The fan filter unit, also known as the FFU, is a self-powered filter purification device, which is mainly a terminal clean equipment composed of a fan and a high-efficiency filter. Main Work Process The air (fresh air) is processed into the required state by the air conditioning processor, then sent...

    Read More
  • Modular Cleanroom System Construction Trends

    Modular Cleanroom System Construction Trends

    19 May, 2020

    At present, the clean room industry is developing rapidly in China, and the industry chain has gradually formed a scale. The upstream is mainly composed of special equipment manufacturers including cleanroom materials and cleanroom equipment. The midstream includes cleanroom design, construction, co...

    Read More
  • Why need to build cleanroom?

    Why need to build cleanroom?

    14 May, 2020

    What is cleanroom Modular Cleanroom is the foundation of pollution control. Control the concentration of airborne particles to achieve an appropriate level of particle cleanliness. Clean room refers to the removal of particles, harmful air, bacteria and other pollutants in the air within a certain s...

    Read More
  • Biological Lab Cleanroom Design and Construction Plan

    Biological Lab Cleanroom Design and Construction Plan

    21 Apr, 2020

    1. Layout According to the requirements of the laboratory, the biological lab cleanroom was designed with a construction area of 23㎡ as an example. There should be a P2 main laboratory (P2 laboratory is Physical Containment Level 2 Laboratory), a one-buffer room, a two-buffer room, and a scrubbing a...

    Read More
  • Food Cleanroom Design and Construction Requirements

    Food Cleanroom Design and Construction Requirements

    09 Apr, 2020

    In recent years, more and more food factories have begun to consider building clean workshops in production, packaging and other work area. The construction of clean workshops can effectively reduce the microbial contamination of the products produced and effectively improve product quality and prod...

    Read More
  • How to Arrange the Hospital Negative Pressure Ward Reasonably?

    How to Arrange the Hospital Negative Pressure Ward Reasonably?

    04 Mar, 2020

    In order to fight the coronavirus, various countries are vigorously managing and preventing the occurrence of the virus. In order to meet the actual clinical needs of the hospital and ensure medical treatment and eliminate various types of infections in the hospital, the negative pressure ward of th...

    Read More
  • Vulcan Mountain Hospital Was Built In 10 Days. How Did It Happen?

    Vulcan Mountain Hospital Was Built In 10 Days. How Did It Happen?

    24 Feb, 2020

    On February 2, Wuhan Vulcan Mountain Hospital was completed. Every second counts! This is a tug of war with time. On January 24, on New Year's Eve, hundreds of excavators arrived at the site and began to level the ground. On January 25, the first day of the new year, Vulcan Mountain Hospital officia...

    Read More
  • Demystifying Wuhan Vulcan Mountain Negative Pressure Ward and ICU Design Key Difficulty Analysis and Solutions

    Demystifying Wuhan Vulcan Mountain Negative Pressure Ward and ICU Design Key Difficulty Analysis and Solutions

    18 Feb, 2020

    1. Overview of negative pressure ward and ICU in Wuhan Vulcan Mountain Hospital  Wuhan Vulcan Mountain Hospital was built to treat newly diagnosed patients with new coronary pneumonia. A total of 1,000 beds were designed for negative pressure wards, which consisted of multiple independent ward ...

    Read More
  • With the Deadly WuHan Coronavirus, What is the P4 Clean Laboratory? 

    With the Deadly WuHan Coronavirus, What is the P4 Clean Laboratory? 

    07 Feb, 2020

    Wuhan Virus Institute owns the first P4 laboratory in mainland China. The mysterious "P4 laboratory" exists in almost single digits in most countries. It is considered as an "aircraft carrier" in the field of virus research. Its research object is viruses that currently have no preven...

    Read More
  • What factors influence successful pharmaceutical plant planning and design?

    What factors influence successful pharmaceutical plant planning and design?

    19 Dec, 2019

    With the rapid development of the biological industry and modern biotechnology, the separation and purification of functional proteins, and the pilot testing of new biotechnology drugs have become key technologies in modern biopharmaceutical engineering. The biotechnology industry is huge and compli...

    Read More
  • What is the difference between an industrial cleanroom and a biological cleanroom?

    What is the difference between an industrial cleanroom and a biological cleanroom?

    17 Dec, 2019

    Laboratory cleaning system design by use (can be divided into two categories) 1. Industrial cleanroom The control of inanimate particles is the object.It mainly controls the pollution of air dust particles to the working objects, and generally maintains positive pressure inside. It is suitable for p...

    Read More
First 1 2 3 Last
[  A total of  3 pages  ]

Newsletter Sign Up

If you have questions or suggestions, please leave us a message,we will reply you as soon as we can !

 
Got Free Inquiry Now We will contact you as soon as possible!
If you have questions or suggestions,please leave us a message,we will reply you as soon as we can!